icon
icon
icon
Diamond Harbour Chairman
SMT. MIRA HALDER
Chairman Of
Diamond Harbour Municipality

Improvement Plan

There are 49 major slums in this municipality. Many of these slums suffer from various infrastructural shortcomings and service deficiencies in the nature of broken septic tanks, open defecation systems, inadequate quantity of drinking water, water logging due to improper drainage, broken roads, inefficient solid waste management etc.

Slum infrastructure improvement plan should also aim at providing basic minimum services to the informal Squatter settlement. generally ,these clusters lying outside the demarcate slum areas of the ULB are located on service land (i.e. land beside main roads, pavement, canals, railway tracks etc).Projects undertaken as a part of slum infrastructure improvement plan should therefore to seek to provide service to urban poor, resident in notified and non notified slums, and squatter settlements in the ULB.

The development activities aimed at addressing these gaps for improving the living conditions of the slum dwellers. Accordingly all the slums have been considered for improvement under this plan and appropriate projects have been designed for bridging the gaps to a feasible extent. Projects have been planned for the improvement of roads, water supply, and drainage systems and for the maintenance of existing slum Infrastructure. The main objective of slum infrastructure improvement plan is:

Objectives

  • To ensure basic infrastructure service to all slum, irrespective of their tenure status order to provide a safe and healthy quality of life to the resident.
  • Brick paved road will be improved in all slums with adequate street light;
  • To ensure the basic educational facility of the slum area.
  • Integrate slum infrastructure to the entire city network
  • Enhance community participation in construction, operation and maintenance in the slum.
  • Achieving segregation of waste from all household in slum area and adopting scientific and sustainable ways of disposal of municipal solid waste in proper dumping ground;
  • Handover specific infrastructure assets to the slum local Samiti/organization, such that they take responsibility of collection of user charges and hence ensure maintenance of the asset created.
  • To identify the BPL, APL family and focus on their needs.
  • To supply adequate water pressure with proper quality to the slum dwellers

 

Latest Tender
K-12(Tender)/A-12/DHM date:07.01.16
Construction of Atithi Bhaban at Ward No.-13 within Diamond Harbour Municipality in the year 2015-2016. Work schedule has been prepared on the basis of P.W.D. for Building Works -2010 & with itís 1st, 2nd & 3rd. Corrigendum
 
Notice
Quotation Notice
To supply for TEMEPHOS LARVICIDE
 
01/16
Applications are invited from the eligible candidates for filling up of regular vacancies in this Municipality. Details with application format can be downloaded from the download link
 
1 (One) Group - D Post under NUHM
Applications are invited for the post of 1 (One) Group -D under NUHM in Diamond Harbour Municipality as per terms & condition mentioned in the Advertisement. Last Date: 22-December, 2015. Click the Download in http://www.diamondharbourmunicipality.org/all-notice.php
 
1 (One) post of LDC under NUHM
Applications are invited for the post of 1 (One) Lower Division Clerk(LDC) under NUHM in Diamond Harbour Municipality as per terms & condition stated in the Advertisement. Last Date: 22- December, 2015. Click the Download in http://www.diamondharbourmunicipality.org/all-notice.php
 
Part Time Medical Officer under NUHM
Applications are invited for the post of Part Time Medical Officer under National Urban Health Mission (NUHM) in Diamond Harbour Municipality as per terms and condition stated in the Advertisement. Last Date: 15-DEC, 2015. Click the Download in http://www.diamondharbourmunicipality.org/all-notice.php